Know the difference
Daily cleaning keeps things tidy; deep cleaning reaches what daily cleaning misses. A schedule ensures nothing is forgotten. It is part of your food safety management system.
List all areas
List every area and piece of equipment: ovens, fridges, extraction, walls, floors, ceilings, drains, cellar, bar, toilets and storage. Include behind and under equipment. Do not miss anything.
Set frequencies
Decide how often each item needs a deep clean: weekly, monthly, quarterly or yearly. Base it on use and risk. Extraction ductwork usually needs specialist cleaning on a schedule.
Assign responsibility
Give each task to a named person or role. Make sure they have time on the rota. Check it gets done.
Use the right chemicals
Use chemicals suitable for each surface and task. Follow the label and safety data sheets. Never mix chemicals.
Use protective equipment
Follow the COSHH assessment for each chemical. Use other controls first, and gloves, goggles and aprons where exposure cannot be controlled another way. With five or more employees, the assessment must be recorded.
Train staff on safe use.
Move equipment
Move equipment where possible to clean behind and under. Make sure it is turned off and isolated. Get help with heavy items.
Clean top to bottom
Clean from high to low so dirt falls onto areas yet to be cleaned. Finish with floors. Clean from the back to the front.
Clean fridges and freezers
Empty fridges, move food to other fridges, and clean shelves, walls and seals. Defrost freezers as the manufacturer recommends. Check seals for damage.
Use specialists
Use specialist contractors for extraction ductwork, pest control and some equipment. Keep certificates. Insurers often require ductwork cleaning records.
Check and sign
Check deep cleans have been done properly. Sign the schedule. Keep records.
Review regularly
Review the schedule regularly and update it for new equipment or problems. Use inspection feedback. Keep improving.
Where a step names the law it gives the principle, not legal advice. Your own policy and the premises licence always come first.
